Loft added layer
Nov.27.2023
-HY-LOFT construction method:
Decorative surface (structural board + wood floor or floor tile).
Prefabricated keel to ensure floor flatness.
18mmOSB board, fireproof drywall ceiling
-LOFT construction steps:
1. Reserve ring beams and elastic wires
2. Lay out side keel, side keel
3. Lay special HY-LOFT beam keel.
4. Cable pipeline laying.
5. Lay 18mm Oolong plate on the beam keel.
6. Lay 1.5mm waterproof coils.
Construction site: